男总裁被保镖c呻吟双腿大张bl,扒开学生双腿猛进入喷水小说,狠狠躁18三区二区一区,日本边添边摸边做边爱60分钟

產品推薦:氣相|液相|光譜|質譜|電化學|元素分析|水分測定儀|樣品前處理|試驗機|培養箱


化工儀器網>技術中心>行業標準>正文

歡迎聯系我

有什么可以幫您? 在線咨詢

FTLM BI107-05涂層附著力熱沖擊試驗標準

來源:上海鼎振儀器設備有限公司   2018年02月07日 17:24  

E1

e2

e3
 

 

                                                   Application
This procedure is used to determine the resistance to coating adhesion loss of coated surfaces of aluminum,plastic, steel, and other substrates when subjected to a wet blast similar to that produced by vehicle wash equipment.

 

 

                           Apparatus and Materials Required
Film Thickness Gauge
      per Ford Laboratory Test Method BI 117-01
Carbide Tip Scribe
      CTS (General Scribe #CM 88) - or equivalent
     12015 egraph Rd.
     Detroit, Michigan U.S.A.
     (313) 531-7668
Utility Knife
      Stanley, Quick Point 10-300 - or equivalent
     (break away tips)
Water Immersion Tank
     Per Ford Laboratory Test Method BI 104-01
    Note:  Thermal shock testing requires:
        a.  38 +/- 2 °C water temperature
        b.  5 ppm maximum dissolved solids
Heater/Circulator
       Fisher Scientific 13-874-70J - or equivalent
Dissolved Solids Meter
      Myron L Company - or equivalent
      833 East Broadway
      San Gabriel, California
Freezer
      Capable of minus 29 +/- 2 °C temperature 

Steam Generator
   a.  Input flow of water to be 2.7 +/- .1 L/min (*).
   b.  Nozzle diameter to be 12.5 +/- .3 mm ID and at least 100 mm long.
   c.  Discharge dynamic head to be 37.9 +/- 1.9 kPa measured 25 mm from the nozzle  using 
??       a   4.7 mm ID tube. A substantially non-diverging discharge is required for this test (**) 
??    (***) (see Figures 1 and 2).
Note:  Electro-Magic Model 100 (and the earlier Model 60) Steam Generator available only 
      from:Atomic Cleaning Systems, 31651 West Eight Mile Road, Livonia, MI 48150, Phone: 
??       (248) 615-4400, has been found to be satisfactory. The Model 100 or Model 60 are no 
??       longermanufactured directly by Electro-Magic. However, Atomic Cleaning Systems is
??       capable ofmodifying new Electro-Magic models to meet the Model 100 specifications
       required for this test.Milwaukee 1/2 inch globe valve No. 1151-1161, 150 SWP 300 WOg
??      is adequate for use in  standardization of generator.
Model 100 Steam Generator
(*)    The pumping pressure is directly related to the input flow rate. The pressure needed for
        therequired flow can be determined by measuring the pump pressure and discharge
        flow rate withthe burner off. When the burner is turned on, the required flow rate is
??        obtained by readjusting to the required pump pressure.
(**)    This is done by placing the tube midstream 25 mm from the nozzle. The tube size must  
??         not bevaried because the densities and velocities are not uniform throughout the cross
??        section of thedischarge stream.
(***)  Adjusting the discharge dynamic head may be required. This must be done in such a
      way thatthe input flow rate as specified in Para (a) above is maintained. This is done by
     adjusting the amount of heat transferred to the water. Increasing the heat will cause the
     flow rate (pressure) of (a) to change. It must be readjusted. This operation will result in an
??      increased dynamic pressure; to decrease it, decrease the heat and then adjust the flow
??    (pressure).

Thermometer
??       Capable of measuring 100 +/- 2 °C
Face Mask
      Full face cover safety mask is required when performing this test.
Gloves
     Gauntlet-type gloves for protection of hands are required.


                                    Conditioning and Test Conditions
  All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 ??C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

                                                          Procedure
1.  Standardize the Model 60 or Model 100 Steam Generator.
    a.  Measure and maintain the input flow at 2.7 L/min. Install a 12.5 mm globe valve in the
??        steam line between coil weld assembly and a 5/32 inch hose nipple. With burner off,
??         engage pump and adjust globe valve until 2.7 L/min is obtained.
        Record the tank pressure that is obtained with the 2.7 L/min flow rate. (This induced
         back pressure simulates the pressure that steam exerts on the system while the burner
         is on.)
   b.  Measure and maintain the mean dynamic head at 37.9 kPa (5.5 psi) using the fixtures as
       described in Figures 1 and 2. Open globe valve and turn on the burner. Allow tank
??       pressure   tostabilize before reading the mean dynamic head. Adjustments of the
       dynamic head are to be  made by changing the amount of heat transferred to the water
??       at the burner. (The flow  rate, as  specified above, must be maintained.)
    c.  Measure and maintain a 98 +/- 2 °C temperature of the steam blast at the test
??        sitedistance.

2.    Measure film thickness per Ford Laboratory Test Method BI 117-01 at proposed test sites
     and record.
3.  Immerse the parts or panels (previously prepared per Engineering Materials Specification)
??     in the water immersion tank for four hours at 38 +/- 2 °C. Aerate the water by placing 6.5
??     mm ID plastic tube at the bottom of the tank and bubble air at a rate of one bubble per
??     second minimum. Maintain a 5 ppm maximum dissolved solids (as NaCl) in the water.
??     Check and record NaCl level using a dissolved solids meter.
4.  Remove the samples after four hours of water immersion and cut an "X" through the
??      coating into the substrate across the panel or part where feasible (see Figure 3).
      a.  Use a scribe to make the cut if the substrate is metal or hard, rigid plastic.
      b.  Use a utility knife to make the cut if substrate is an elastomeric material.
5.  Place the test samples in a freezer at minus 29 +/- 2 °C for a three hour minimum freeze
    cycle.
6.  Within 30 seconds from freezer removal, direct the steam blast at the center of the "X" cut,
??    at a distance  of 2 to 3 inches and 45° to the sample, in the direction shown in Figure 3.

 Note:  High pressure wet steam represents a potential safety hazard. Not only is it necessary|
            to secure the samples properly, but full face protection and gloves are required.
7.  After 30 seconds, record area (mm2) of coating removal by visually measuring with a
??      metric ruler  (typical triangular coating removal: Area = 1/2 Base x Height). Also examine
??      the surface and report  any blushing, whitening, or loss of gloss.
8. If a failure occurs, note number of seconds after steam black initiated that the failure 
      occurred.


Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.
Each party is responsible for determining proper use and handling in its facilities.
                                                     ATTACHMENT ONE
                                                      RATING SCALE FOR
                                             THERMAL SHOCK TEST PANELS

                                                    RATING               PEEL BACK
                                                            20      =       No removal
                                                            19      =       < 0.5 cm^2
                                                            18      =       < 1.0 cm^2
                                                            17      =       < 1.5 cm^2
                                                            16      =       < 2.0 cm^2
                                                            15      =       < 2.5 cm^2
                                                            14      =       < 3.0 cm^2
                                                            13      =        < 3.5 cm^2
                                                            12      =        < 4.0 cm^2
                                                            11      =        < 4.5 cm^2
                                                            10      =        < 5.0 cm^2
                                                             9       =         < 5.5 cm^2
                                                             8       =         < 6.0 cm^2
                                                             7       =         < 6.5 cm^2
                                                             6       =         < 7.0 cm^2
                                                             5       =         < 7.5 cm^2
                                                             4       =         < 8.0 cm^2
                                                             3       =         < 8.5 cm^2
                                                             2       =         < 9.0 cm^2
                                                             1       =         < 9.5 cm^2
                                                             0       =          > 9.5 cm^2
                                  SEE SPECIFICATION FOR ACCEPTANCE CRITERIA RATING

 

undefined

                                                        Figure 1

undefined
 

                                                         Figure 2

 undefined

                                                                 Figure 3

undefined

                                                    Figure 4

免責聲明

  • 凡本網注明“來源:化工儀器網”的所有作品,均為浙江興旺寶明通網絡有限公司-化工儀器網合法擁有版權或有權使用的作品,未經本網授權不得轉載、摘編或利用其它方式使用上述作品。已經本網授權使用作品的,應在授權范圍內使用,并注明“來源:化工儀器網”。違反上述聲明者,本網將追究其相關法律責任。
  • 本網轉載并注明自其他來源(非化工儀器網)的作品,目的在于傳遞更多信息,并不代表本網贊同其觀點和對其真實性負責,不承擔此類作品侵權行為的直接責任及連帶責任。其他媒體、網站或個人從本網轉載時,必須保留本網注明的作品第一來源,并自負版權等法律責任。
  • 如涉及作品內容、版權等問題,請在作品發表之日起一周內與本網聯系,否則視為放棄相關權利。
企業未開通此功能
詳詢客服 : 0571-87858618
主站蜘蛛池模板: 定结县| 镇巴县| 宁海县| 蒙阴县| 贺兰县| 横山县| 高安市| 昭苏县| 清苑县| 建始县| 宝鸡市| 鄂托克旗| 察雅县| 灌南县| 乐山市| 翼城县| 武穴市| 砚山县| 太白县| 会东县| 静海县| 浦东新区| 道孚县| 盐源县| 平南县| 景洪市| 施秉县| 平山县| 台北市| 冀州市| 阿克陶县| 蕲春县| 湖州市| 荥阳市| 凤凰县| 金川县| 泗水县| 通州市| 稷山县| 阿巴嘎旗| 娱乐|